What Size Dumpster Do You Need?

Most cleanouts fit a 10 or 15-yard dumpster, most roofs and kitchen remodels fit a 20-yard, and construction jobs take a 30 or 40-yard. Answer three questions below to get a size for your project.

Deliveries 7 AM–5 PM · Book by 3 PM for next-day delivery

  • Our own trucks & drivers
  • Scale ticket on every bill
  • Boards under every drop
  • Overage by the exact pound
Green roll-off dumpster set on wood boards on a lawn
Green roll-off dumpster beside a brick commercial building
2–5 tonsincluded by sizeNext-daybook by 3 PMScale ticketon every final bill

Pick a size in three questions

Choose your project, how big it is, and whether it includes heavy debris. The picker suggests a size and shows the pickup loads and included tons. The table under the picker shows the same rules, so you can check the logic yourself.

1. What is the project?
2. How big is it?
3. Any heavy debris?
Example: a medium roof, light debris20-yard dumpsterAbout 8 pickup loads, 3 tons included. 7 days included. Change any answer above to see a different size.See the 20-yard details
How the size picker decides. Heavy debris always goes to a 10-yard, or a 15-yard for large amounts, filled no higher than halfway. Roofing sizes assume one layer at about 240 lb per square (three 80-lb bundles); check the weight on your own bundle wrapper.
ProjectSmallMediumLarge
Cleanout or move10-yard15-yard20-yard
Remodel10-yard (bathroom)20-yard (kitchen)30-yard (whole house)
Roof tear-off15-yard (up to about 20 squares)20-yard (up to about 25 squares)30-yard (up to about 33 squares)
New build or addition20-yard30-yard40-yard
Yard or brush10-yard15-yard20-yard

Call to confirm your size(432) 271-7372

How do the four dumpster sizes compare?

The 10-yard dumpster is 12 ft long with 2 tons included. The 15-yard is 16 ft long with 2.5 tons. The 20-yard and 30-yard share a 22 ft by 8 ft footprint, with 3 and 4 tons. The 40-yard is 8 ft tall with 5 tons. Every size includes 7 days, delivery and pickup.

SizeL × W × HPickup loadsTons includedRentalBest for
10-yard12 ft × 8 ft × 3.5 ftabout 42 tons (4,000 lb)7 daysBathroom remodels, small cleanouts, concrete or dirt
15-yard16 ft × 7.5 ft × 4.5 ftabout 62.5 tons (5,000 lb)7 daysGarage cleanouts, small roofs, heavy debris
20-yard22 ft × 8 ft × 4 ftabout 83 tons (6,000 lb)7 daysKitchen remodels, whole-house cleanouts, most roofs
30-yard22 ft × 8 ft × 6 ftabout 124 tons (8,000 lb)7 daysConstruction, additions, large tear-outs
40-yard22 ft × 7.5 ft × 8 ftabout 12–165 tons (10,000 lb)7 daysMajor demolition, new construction, large commercial jobs
Outside dimensions. Pickup loads assume an 8-ft bed loaded level, about 2.5 cubic yards each. Weight over the included tons: $75 per ton, billed by the exact pound. How weight is billed.
Dumpster sizes compared to scale10 yd12 × 8 × 3.5 ft · 2 t15 yd16 × 7.5 × 4.5 ft · 2.5 t20 yd22 × 8 × 4 ft · 3 t30 yd22 × 8 × 6 ft · 4 t40 yd22 × 7.5 × 8 ft · 5 tfull-size pickup, about 17–19 ft, for scale
All four sizes to the same scale. Heights are wall heights; debris must stay level with the top rim.

Does volume or weight decide the size?

Volume decides the size for light debris like furniture, boxes, drywall and wood. Weight decides it for heavy debris like shingles, concrete, dirt, brick and tile. A 20-yard dumpster full of household junk may weigh 2 tons. The same dumpster half full of roofing can pass its 3 included tons.

That is why roofing sizes follow roof squares, not room size, and why heavy debris has its own rules. Weight over the included tons costs $75 per ton, billed by the exact pound from the landfill scale ticket. The weight and overage guide shows how to estimate your load.

Which way should you round when you are between two sizes?

Round up for light, bulky debris, because a second haul costs a full rental. Round down for heavy debris, because a bigger dumpster only tempts you to load more weight. If the project is mostly heavy material, go by tons, not cubic yards.

  • Too small means a swap: we haul the full one and drop an empty one, billed as a new rental.
  • Too big means paying for space you never fill. Your included tons do not change with how full the dumpster is.

Size pages for each dumpster

Prefer a quick visual? Tap through dumpster sizes side by side.

Dumpster size questions

What does "yard" mean in a 20-yard dumpster?

The yard is cubic yards of space. A 20-yard dumpster holds about 20 cubic yards of debris when it is loaded level with the top rim. One cubic yard is a cube 3 feet on each side. An 8-foot pickup bed loaded level holds about 2.5 cubic yards, so the 20-yard holds about 8 pickup loads.

Is it cheaper to rent a bigger dumpster than I need?

A bigger dumpster costs more up front but can save a second haul. A swap counts as a new rental, so running out of room costs more than one size up would have. Paying for space you never fill is the other risk. When the project could go either way, call and describe it; we size from the debris, not a guess.

What is the most popular dumpster size?

The 20-yard dumpster suits the widest range of jobs: kitchen remodels, whole-house cleanouts and most single-layer roofs up to about 25 squares. It is 22 ft long, 8 ft wide and 4 ft high, with 3 tons included. Low walls make it easy to toss debris over the side.

Which dumpster size is best for concrete or dirt?

Concrete, dirt, brick and rock go only in the 10-yard or 15-yard dumpster, loaded no higher than halfway up the walls. Heavy debris reaches the highway weight limit long before a bigger dumpster would fill. Details are on the concrete and dirt dumpster page.

Will a 30-yard dumpster fit in a normal driveway?

The 30-yard dumpster has the same 22 ft by 8 ft footprint as the 20-yard. It is just taller, at 6 ft. If your driveway fits a 20-yard, it fits a 30-yard. The truck still needs a straight approach and clearance from wires and branches overhead.

Call now · deliveries 7 AM–5 PM

Ready for a dumpster?

Tell us the project and the address. We confirm the size, the 7 days and the included tons before the truck rolls. Book by 3 PM for next-day delivery.

(432) 271-7372
Roll-off truck hauling a dumpster
Call now(432) 271-7372Quote